6. Development Control

Development Control, if in doing their own

Supervision of construction on the project in itself would do differently with that in doing the project by the contractor. If the project in general, do yourself the toughest supervision is supervision of labor, if using a payment system daily, if not properly supervised the project might be delayed from the schedule already determined. If using bulk power system, there is a possibility because the builders did not pay attention to quality targets such development work. Therefore to note that the system be taken daily or wholesale power, adjust our capacity as the assignor, to what extent we can control the course of the project, if we could give more time, daily payment system can take, but if we as the assignor has a limited time the entire stock system power can also be an alternative provided that made the agreement about the quality of the work when it is not capable of unloading at no charge.

The risks above are the most common thing when doing the job units own with the help of artisans directly without the services of contractors, in addition to other risks such as the work that is not appropriate due to the lack of supervision, etc.

Development Control by the Contractor if in doing

7. Work Checklist

Well this is their building stages can we submit, may be useful for those who want to build a house.